Continuous Innovation in the World of CIPP

Posted by Olivia Singer on Apr 29, 2021 2:15:41 PM

Cured-in-place pipe for trenchless rehabilitation has made major strides since its inception 50 years ago. New advancements in technology have helped the installation process become safer and more efficient, and made CIPP a stronger, more durable solution for repairing failing pipes. SpeedyLight+

From new resins for stronger liners, to new fabrics for more flexible ones, the materials available have advanced significantly. 

But the most impressive changes have come from the innovations in curing methods. The use of light-based technology, like SpeedyLight+ from PRT, has given installers a simpler, faster and more reliable method for curing. 

Light-based Advantages

Unlike curing with hot water or steam, light-based curing can be used on both felt and fiberglass liners, which provides versatility when confronted with bends or transitions in a line. And there’s no on-site wet-out required, no mixing of resin and no refrigeration needed.

Because SpeedyLight+ uses LEDs rather than incandescent bulbs, it consumes three times less energy than standard lamp-based technology while emitting four times more radiant energy. This can mean a more complete cure using fewer resources and less time. 

Looking Ahead

The impact CIPP has made on the municipal underground infrastructure industry is incomparable—completely transforming municipalities’ approaches to pipe rehabilitation. As we look to the future with light-based technologies, we only expect to see more and more innovation in the world of CIPP.


Read on about SpeedyLight+ or schedule an on-site demonstration:

Learn More

Topics: SpeedyLight+ Light Cure for CIPP

About PRT

Pipeline Renewal Technologies delivers innovation to processes ranging from pipe point repair to relining and lateral reinstatement. Cutting edge technology, combined with dependability and support, have made us the industry's partner of choice.

Recent Posts